NAM runtime investigation — 2026-09-25

No confirmed root cause or new fix. The converter remains on its existing engine. The unsuccessful 0.15 trial is not promoted.

New evidence: execute the actual ZDL

Used Ziddle’s C674x interpreter from source archive https://berbasoft.com/ziddle/ziddle-source-1787802520.zip with the checked-in tools/emulator/src/bin/namcheck.rs harness. Tested the supplied NAMLite-amptrec.ZDL, SHA256 9d445680e567673cd9bbead290e090aa49c1f258f5456ef62a27e73f76e47890. The 16,384-sample mono test is silence for initialization/warmup followed by 220 Hz plus seeded low-level noise. Controls44/27/100, stereo input duplicated. It exercises ring wrapping after initialization. The reference is the same capture’s host wrapper, including drive/mix/output smoothing.

Logs, raw float output and report: build/probes/namlite/machine-audit/. The host uses knob values directly; the interpreter uses firmware-style edit handlers, explaining a few ULPs of control/output differences.

Why overload alone is not established

The older0.07 identity model was reported clean;0.09’s delayed identity was reported delayed and bitcrushed. Those binaries share audio instructions, layout, loop counts and memory allocation, with different weights. Both now measure25,156 emulated cycles/callback—more than the current crackling engine.

This is important counterevidence to an instruction-count-only explanation. It does not exclude missed real-time deadlines, data-dependent hardware effects, or a changed patch/setup. It does require keeping history-dependent runtime behaviour in the investigation instead of treating overload as proven. The current user report remains: direct recording, NAM alone, more artifacts when adding other effects, no audible improvement with0.15.

What is and is not ruled out

Area Evidence / remaining uncertainty
Incorrect capture export All1871 weights match the supported source Lite model; no mismatch found.
Generated network math Host agrees with NAM Core; actual target instructions agree with host on the exercised input.
Host buffer layout Eight planar L/R samples and in-place ctx[5] agree with stock disassembly and prior clean diagnostics.
DSP deadlines / physical memory Still open. Emulator cycles exclude physical cache/memory stalls and firmware interference.
History-buffer corruption or lifecycle Still open on hardware. Guarded host tests and emulator pass; earlier delayed-identity result implicates history-dependent behaviour.
Clipping Delivered recording is below full scale; steady test levels do not hit output limiter. This does not exclude earlier/transient clipping.
Capture sample rate 48kHz model runs at44.1kHz without conversion. Known fidelity limitation, but cannot explain the old delayed-identity corruption by itself.
Original large IR freeze Load-only also froze; separate failure and not evidence proving NAM overload.

Next discriminating work

  1. Test a lightweight integrity check across the same per-instance history arena: distinguish bad retained data from expensive neural processing. Do not repeat the already-passed simple dry/identity test as if it were new evidence.
  2. Measure real callback execution/arrival timing, rather than infer headroom from compiler scheduling or desktop throughput. Confirm any timer reads work without changing firmware clock/cache configuration.
  3. If retained history is sound but deadlines fail, optimize memory traffic and total callback work. If history fails even without the network, investigate the arena contract/lifecycle first. Another capture will not isolate this.

No additional hardware diagnostic is installed or released by this investigation.

History integrity diagnostic ready

dist/NAMMem.ZDL, separateFXID909/version0.01; PE lists NAMMem under Delay. Checks133360bytes using32 volatile pattern reads/writes per callback. Initial fill followed by rotating indexed patterns catches stale or corrupted data; failure latches until Test0→1. Quiet two-beep groups indicate completed passing sweeps, four beeps indicate mismatches. Persistent single beep or no tone is inconclusive. No neural processing and no hardware clock/register changes. Guards,4-alignment, independent instances, injected corruption, pulse counts, reset/bypass tests pass on host. Actual ZDL passes emulator init/edit/instruction checks over12500callbacks; max898 emulated cycles versus18612 for current NAM. This checks the same footprint but not identical history access patterns/load. A pass narrows the investigation, not proof that all NAM history is safe. Hardware result pending. Build/validate scripts in src/hardware_probes/nam_memory.

Diagnostic correction0.02

User selected0.01 and heard no beeps. Reproduction using legal raw Test1 shows params[5]=0.01 because the LineSel-derived handler divides by100. The probe incorrectly checked0.5; its earlier emulator test used invalid raw100 and host test seeded1.0. This was a diagnostic bug, not evidence about NAM memory. 0.02 checks0.005, host tests seed0.01, and validate_target.py verifies actual ZDL Test0 silence and Test1 exactly two passing pulses after initialization. Corrected0.02 replaces dist/NAMMem.ZDL. Hardware result pending.

Hardware result: NAMMem0.02 passes

User reports working with two beeps repeating. The lightweight probe repeatedly verifies its entire133360-byte footprint without latched mismatches. Basic arena retention under this access pattern/load now has positive hardware evidence. This does not prove the neural kernel’s strided accesses, cache/interrupt behaviour, or deadlines. Next investigation: measure callback timing during the real neural kernel, rather than repeat the memory test or another capture.

NAMTime0.01: actual capture timing diagnostic ready

Separate Delay effect FXID910 in dist/NAMTime.ZDL uses the original TREC capture with defaults44/27/100. Read-only TSCL calibration over4096 dry callbacks precedes warm-up and4096 measured neural callbacks. It then parks the network and alternates low-pitch average / high-pitch peak beep groups. Codes1=timer unavailable,2=below50%,3=50–80%,4=80–100%,5=at least100% of calibrated callback interval. These are elapsed core-call ratios, not total pedal CPU utilization; code-layout changes and interrupts remain caveats. Host timer rollover/threshold/reporting/guard/reset checks pass. Binary audit checks exact coefficient tables, ten address relocations and control init. Target emulator accepts all instructions and runs the stopped-timer path (its TSCL remains zero); this does not validate the measured neural path. File20270bytes, audio6848bytes, state133404bytes. SHA256: 2dba6c756fa7c554fe6e73c199ab735918939d2902bd876ba932c77faff9ebfd. Hardware timing results pending. NAMMem0.02 remains a confirmed hardware pass.

Hardware result: NAMTime0.01 reports 5 low / 5 high

On 2026-09-25 the user reports a quick noise when enabled, followed by alternating five low and five high beeps. Both average and peak elapsed core measurements therefore meet or exceed the calibrated low-load callback interval. Together with NAMMem0.02 passing, this makes a real-time deadline problem the leading explanation for the crackling. It does not isolate arithmetic cost, memory stalls or interrupt/scheduling overhead, and it does not give the exact overrun ratio. The instrumented kernel differs in code layout from production. The initial noise occurs before reporting parks the network; it is consistent with the measurement phase, not separately proven to be an initialization bug.

Next work should reduce measured runtime cost, with coefficient/output parity checks and the same hardware timing comparison. Do not promote the ineffective 0.15 unroll trial or switch captures as a purported fix. Preserve native-rate model behavior first; lowering inference rate or simplifying the network is a separate sound-changing fallback, not a transparent optimization.

2026-09-25: full-rate optimization screening and trial0.16

TREC and Marlboro both parse as the same23-layer,3-channel A2 Lite geometry with1871 weights and48kHz source rate. Amp+cab capture content does not add a separate cabinet convolution to this engine. Their fixed neural workload is the same; learned weights differ. The existing native44.1kHz/48kHz model rate mismatch remains a separate limitation.

Screened temporary-local storage, sample-major accumulation, fixed-tap loop expansion, merged loop/finalization and paired-tap accumulation. Tested target callback cycles versus original18612: local19803; sample-local27252; fixed-tap26228; split fixed-tap30878; fused18360; paired17279; paired plus sample unroll17685. Flat loop compiler schedule worsened to20-cycle initiation interval and was not target-tested. Reassociation scheduling showed no useful change and was not promoted. The source builder is tools/nam_prototype/build_optimization_trial.py; private outputs live under build/probes/namlite/opt-*. Full screening results saved to build/probes/namlite/optimization-screening.json.

Selected paired taps for experimental NAMLite-amptrec0.16 in dist, sameFXID900. No rate reduction, coefficient change, added buffering or changed sample accumulation order. Host silence/impulse/noise/sine outputs match NAM Core exactly and pass block/reset comparisons. Actual TI instruction emulation passes init/edit/opcode checks and matches wrapper reference within8.95e-8. Tables,8 relocations and init handlers pass binary audit. 19418byteZDL,6016byteaudio; SHA256: 4a61641026c40f9769996626dd75ede1740bb8ca1c8a2819352677a5fd286bea.

The7.16% emulated whole-callback reduction is modest (about4% versus failed 0.15) and excludes actual cache/memory/interrupt effects. Hardware result is pending; this is not a claimed fix. Converter remains0.14 and baselineNAMLite is untouched. NAMTime0.01 still measures the original kernel and must not be used to judge0.16. Prior dist capture and PNG are backed up under the selected trial’s rollback-pre-0.16 directory.

Review of reduced-rate changes (2026-09-25)

User reports the reduced-rate trial is crackle-free but distinctly narrower and muffled. This supports insufficient real-time headroom as the leading problem; it does not make reduced-rate processing sonically transparent. No runtime, converter or dist binary was changed during this review.

Actual instruction emulation at44/27/100, same TREC coefficient/header data: original8/8=18612 cycles; 0.16paired=17279; rate4of8=8937; rate7of8=18316. Thus4/8 saves51.98%, but7/8 only1.59%, and is slower than the0.16 trial. All init/edit/audio paths completed without unsupported instructions. These are emulator costs, not physical pedal headroom. Neither code5 timing report nor these results establish the comment’s assertion that exactly2x is needed.

Findings in src/hardware_probes/namlite/namlite.c:

Keep the half-rate result as evidence, not a fidelity-preserving release. Next work: proper continuous rational resampling with anti-alias/reconstruction filtering, neural-step warm-up, and measured whole-callback timing for each rate; compare at matched loudness with the48kHz NAM reference. Such resampling will not itself restore the dynamics of a48kHz model executed at22.05kHz. If adequate headroom requires half rate, a smaller full-rate model/distillation is the more faithful long-term direction. Existing converter remains untouched.

Reproduction: tools/nam_prototype/review_rate_trial.py; conversion/timing reports and target logs: build/probes/namlite/rate-review/.

Hardware result: 6/8 trial has no reported bitcrushing

User reports “NAM-6of8 uploaded to pedal, no bitcrushing.” This is positive hardware evidence for a cleaner reduced-rate setting above4/8. Tonal fidelity and operation alongside other active effects were not reported in this test; neither is established by this result. The known input spacing, filtering and warm-up review findings still apply. No binary changed for this report.

Follow-up: user says6/8 is “Brighter, but still somewhat muffled.” It is a useful crackle-free baseline, not a confirmed tonal match. Actual target emulation measured14683 cycles/callback versus18612 full-rate (21.1% less), with no unsupported instructions or init/edit errors. This timing is not physical hardware headroom and does not establish multi-effect stability.

2026-09-25: NAMProf 0.01 hardware result — memory-bound, and the working set is fixable

NAMProf (FXID 911, src/hardware_probes/nam_profile/) timed the same full-rate TREC kernel as NAMTime and reported placement, decoded from a direct recording with tools/decode_namprof.py (sync and XOR checksum valid):

word value
model min / avg / peak 32,333 / 37,510 / 51,231 cycles
emulated, same code 18,612 cycles
arena 0xC022D000–0xC02D9440 (705,600 B), DDR, MAR = 1 (cacheable)
weights 0xC0202AB8, DDR, cacheable
ctx 0x11F03000 — L1D SRAM
live cache config L1D 16 KB, L2 128 KB (matches the static firmware reading)

Memory stalls are real and structural. The C674x is statically scheduled, so real minus emulated is stall time: 13,721 cycles (42%) even in the fastest of 4,096 callbacks, 18,898 (50%) on average. The uncached-DDR worst case is ruled out — the arena is in the cacheable first 16 MB.

Cause: the working set just overflows L2. History rings are rounded up to powers of two: 129.8 KB of history + 7.3 KB of weights = 137 KB against a 128 KB L2. Sized exactly, history is 77.3 KB and the working set 84.6 KB — well inside L2. The worst offenders: dilation 101 needs 513 floats and gets 1,024; dilation 239 needs 1,203 and gets 2,048. Exact sizing needs a non-mask wrap (compare-and-subtract; % is banned), costing a couple of ops per load address against DDR misses. Output is unchanged — same maths, different layout.

The period word is NOT the callback budget, and NAMTime overstated the overrun. NAMProf measured 10,724 counter ticks between callbacks — a 59 MHz clock at face value, implausible for a C674x — and taken as budget it puts the model at 350% on average. That cannot be right: 6/8 rate does 79% of the work and plays clean on hardware. The counter evidently does not advance in wall-clock time between callbacks; most likely it pauses while the CPU idles, making period the work done per callback outside the model, not the time available. Fitting the hardware observations (full rate crackles at peaks, 6/8 clean) puts real capacity at roughly 51–62k cycles per callback, i.e. a ~280–340 MHz clock; a standard 300 MHz C674x fits exactly. NAMTime 0.01 used the same calibration, so its “code 5” was directionally right but the magnitude is not meaningful. Only same-context ratios (real vs emulated model cycles) are trustworthy from these probes.

Next: full-rate build with exactly sized rings. Expected to remove most of the 13.7–18.9k stall cycles; that would put full-rate peaks near NAM6’s measured clean envelope.

2026-09-25: exact-ring full-rate build (NAMFull 0.19) and NAMProf2

tools/nam_prototype/exact_rings.py rewrites a generate_block kernel so every history ring is exactly (k-1)*d + 8 floats instead of the next power of two: history 129.8 KB → 79.1 KB, working set ~86 KB against the 128 KB L2. validate_exact_rings.py requires bit-identical output against the power-of-two kernel (8-sample blocks, ragged blocks 1..8, reset mid-stream) and checks a per-layer range guard. Build: build_halfrate_trial.py --steps 8 --exact-rings.

Design rule learned the hard way: no data-dependent condition inside any loop body. The first version wrapped each index with if (q >= n) q -= n inside the sample loops. Host: bit-exact. TI build in the emulator: output grew every callback until the wrapper’s range check reset it (~every 14 callbacks), though every ring stayed finite and in range — the reads were fetching real samples from the wrong time. Built with -mu (no software pipelining; note the flag is --disable_software_pipeline, and a misspelling is silently ignored) it was correct. So the software-pipelined form of loops whose wrap predicate changes per iteration is wrong in TI’s pipeliner or in Ziddle’s SPLOOP model; which one is not established. Because a TI miscompile could write outside a ring on hardware (a freeze), that shape was abandoned, not flashed.

The shipped design has no such predicates: each plane carries an 8-float mirror (h[n..n+7] == h[0..7]) so a tap’s 8 reads run into it instead of wrapping, with one scalar wrap per tap outside the loop; writes are split into at most two loops with precomputed bounds, then the mirror is refreshed. TI build: emulator output matches the power-of-two build within 3e-7, no resets; tools/emulator namstate checks positions, finiteness and the mirror invariant after every callback. Relocation profile identical to the power-of-two build (24: ABS32 ×10, ABS_L16/H16 ×7).

Cost: 22,040 emulated cycles vs 18,612 (+18%, for the split writes and mirror refresh). The bet is the memory saving: on hardware the power-of-two kernel stalled 13.7k (min) to 18.9k (avg) cycles per callback. NAMProf2 (FXID 912) measures this exact kernel on the pedal; decode with tools/decode_namprof.py rec.wav --emulated 22040. NAMFull (FXID 903) is the playable build. Both staged in dist/ (git-ignored). Hardware results pending.

2026-09-25: NAMProf2 hardware result, then NAMFull2 0.20 / NAMProf3

NAMFull 0.19 still crackles. NAMProf2 (same exact-ring kernel) on the pedal:

  power-of-two (NAMProf) exact rings (NAMProf2)
emulated 18,612 22,040
real min / avg / peak 32,333 / 37,510 / 51,231 31,497 / 34,464 / 43,444
stall avg (real − emulated) 18,898 12,424 (−34%)

Fitting L2 cut the stall by a third, but +3,428 cycles of added work (split writes, unconditional mirror refresh) gave much of it back: average −8%, peak −15%. NAM6 plays clean at ~79% of the power-of-two work, i.e. an estimated peak of ~40k; this is ~43k, so the remaining gap is roughly 7–10%.

Two further layout-only changes, both bit-identical on the host (validate_exact_rings.py now checks both layouts) and clean in the emulator (namstate ... il checks the interleaved mirror):

  1. Mirror refreshed only when a block writes slots 0..7 (base < 8 or the write wrapped) — a scalar test outside the loop, so the no-predicate rule holds. Emulated 22,040 → 20,362.
  2. Channels interleaved per slot (h[3q+ch]) instead of three planes, so a tap’s 8-sample window spans ~2 cache lines instead of 3. The residual stall is L1D (16 KB) misses served from L2, so fewer lines per read should cut it; it also made the reads cheaper: emulated 20,362 → 19,666 (+1,054 over the original’s arithmetic, down from +3,428).

NAMFull2 (FXID 904, NAM-full2, 0.20) is the playable build; NAMProf3 (FXID 913) measures it — decode with --emulated 19666. Relocation profile unchanged (24). Hardware results pending.

Independent review of NAMProf/cache proposal and exact-ring proof

The reported placement/cache data makes a tighter history layout a strong full-rate candidate, but the cache-capacity explanation is not yet proven. Current history alone132864bytes; history plus1871floatweights140348bytes (137.06KiB). Exact-capacity planar rings with the same two-float plane padding use79140bytehistory; with weights86624bytes (84.59KiB). Scratch, cursors, code, firmware and other effects are additional cache consumers. Fitting a nominal capacity does not exclude conflict misses; see TI SPRUG82A section3.3.

Added an experimental generator (not a converter/release change): tools/nam_prototype/generate_exact_rings.py. It uses per-layer cursors and single conditional wrap corrections, preserving arithmetic order and rate. Caller must initialize cursors via NAM_RESET_RINGS; no runtime wrapper has been switched to this layout. Generated private files: build/probes/namlite/exact-rings-review/. Host tests against upstream NAM Core are bit-exact for silence, impulse, noise and sine across16384samples and 8/257-frame processing partitions. This verifies those vectors, not a universal proof or pedal-speed result. No exact-ring ZDL published or installed.

Cautions about earlier timing interpretation: The reported10724 dry-period value must not be treated as a verified wall-clock callback budget. The claimed idle pause/300MHz clock and51–62k capacity remain hypotheses, not measurements. My earlier claim that five beeps established actual deadline overrun was too strong; it established only a ratio to that dry calibration. Reduced-rate hardware results still support a workload-related problem.

Also, NAMProf is not machine-code-identical to standalone NAMLite: running the actual profiler binary in the emulator gives20076cycles for measured-phase callbacks versus18612 standalone. The profiler inlining/instrumentation changes code scheduling. Thus subtracting18612 to label all excess hardware timing as memory stalls is not a precise isolation. Cache delays remain plausible, but interrupts and profiler differences must be separated or bounded before giving a stall percentage. Raw direct recording was not re-decoded in this review; hardware words were read from the existing investigation notes.

2026-09-28: tone stack (NAMEQ 0.21, FXID 905)

Owner report on NAMFull2: works, but riding the edge — one fuzz before it fits with an occasional crackle; two more stock blocks don’t.

Bass / Mid / Treb added as knobs 4–6 (--tone-stack), voiced like the NAM plugin’s BasicNamToneStack: bass low shelf 150 Hz ±20 dB, middle peak 425 Hz ±15 dB (Q 1.5 cut / 0.7 boost), treble high shelf 1.8 kHz ±10 dB, RBJ biquads in the plugin’s order. Coefficients are computed exactly at build time for every knob position (tools/nam_prototype/tone_stack.py, 3×101×5 floats) — no runtime trig, which the loader cannot resolve. Knob 50 is an exact identity, so a flat EQ is bit-identical to NAMFull2, on the host and on the TI build. validate_tone_stack.py: float filter within 0.004 dB of the double reference; Treb 90 measured +7.9 dB through the whole wrapper (design +8.0). (A first measurement said +1.9 dB — an unwindowed FFT, where leakage from the low notes swamps a cab-simulated amp’s few high bins.)

Cost +345 cycles (~1.8%), independent of settings. The EQ is one combined 8-sample loop after the network, with the ±16 range check folded in branch-free and run before the EQ (a +20 dB boost must not look like a diverged network). Measured alternatives: per-band loops that skip untouched bands were worse whenever the EQ is used (+461 treble-only, +790 all three), because separate loops cannot overlap the recursive filters.

Second instance of the pipelining hazard. Removing the old range check from the per-sample output loop also removed its early return — which had been keeping that loop out of software pipelining. Its body has per-sample predicates (warm-up counter, clip), so it became the same shape that failed in the exact-ring work: host still bit-identical, TI build off by up to 0.09 with a flat EQ. An early-return NaN/∞ guard (±1e4, unreachable by the EQ) restores the loop’s original shape and bit-identity. Lesson: an early return can be load-bearing; check SPLOOP counts when restructuring loops, and compare the TI build, not just the host.

PE: NAM slots are rebuilt from 3-knob templates, which hid Bass/Mid/Treb. extract_effect_db.py now takes a staged dist/ build’s knob list for its slot.

2026-09-28: register-accumulated taps (engine 0.22)

Hardware report on 0.21: works, but only one stock effect (Great Muff) fits beside it and the chain rides the edge. The tap loop was the target: SPLOOP scheduled it at ii=5 with 6 stages, but each layer’s loop runs only 8 iterations (one per sample of the block), so ~40% of every loop is prologue and epilogue, and that loop runs once per tap (156 times per callback).

exact_rings.transform(..., regacc=True) turns it inside out for the common 8-sample block: the tap loop is outer, samples are inner and fully unrolled, and the 3 channels x N samples of output live in registers until the last tap. The ring index is computed once per tap with a branch-free wrap (x + (n & (x >> 31))), so the loop body stays predicate-free (see SAFE-DSP-RULES: data-dependent predicates inside pipelined loops are the known TI miscompile/mis-emulation hazard). Ragged blocks (count != 8) keep the original loop.

Emulated cycles exclude memory stalls, which NAMProf showed are a large share on hardware, so the real saving is not guaranteed to be the full 21%; the working set is unchanged, so stalls should not grow. Packaged as loader engine 0.22; capture 1 rebuilt through the loader (byte-identical to a direct build). 0.21 templates and capture 1 archived under build/nam-archive/2026-09-28/.

2026-09-28: noise gate (engine 0.23) and capture 2

Hardware report on 0.22: “seems much better”, but steady noise from the effect. The recording (no playing, Input 100 / Bass 75) is a steady -40 dB floor: a 134 Hz resonance plus hiss peaking at 3-4 kHz and gone above 5 kHz – the capture’s own amp/cab voice. The emulator reproduces it from -76 dB of white noise at the input (-44 dBFS out), and gives silence for silence, so it is the capture amplifying input hiss (~35 dB of gain), not the engine.

Gate (nam_gate.h, -DNAM_GATE, knob 7): detection on the raw mono input, gain applied to the model output through the existing net.gain[] (after the tone stack), like the NAM plugin. All gate logic is scalar per callback; the only new loop is a predicate-free sum of squares (ii=4). Envelope: fast rise, ~10 ms fall; open above threshold, stay open to 6 dB below (hysteresis) plus a 30 ms hold; gain to 1 in ~0.5 ms, to 0 over ~50 ms, snapped to exactly 1 / 0. Threshold -100 + 0.7 x knob dB (power table, no logf/powf helpers).

Capture 2: “Marlboro Smokey Amp” (TONE3000, crunch), the A2 Lite submodel of a SlimmableContainer, made through the loader’s convertNamed into slot 2 (FXID 901). Its emulator output equals a direct build’s exactly. At the same knobs it is brighter (spectral centroid ~2.1 kHz vs ~1.1 kHz), leaner in the lows and more dynamic (crest 12 vs 8.5 dB) than amptrec.

Hardware: 0.23 froze on boot (“never fully loads”), both 0.23 files installed (amptrec slot 1 and smokey slot 2) and the saved patch holding amptrec. Static review found nothing: _init, all 8 edit handlers (Gate = knob id 8, params offset 44) and relocation shapes match known-good 8/9-knob customs; matcheck, namcheck and namstate pass. Candidates: (1) slot-2 template (never booted on hardware before), (2) the 7-knob layout meeting a patch saved with 6 knobs, (3) the gate code. Bisect files, all in dist/ with distinct FXIDs so they install together: NAMLite-smokey (901) = 0.22 engine in the slot-2 template; NAMLite-t7knob (920) = 7 knobs, gate compiled out (--undefine=NAM_GATE, output bit-identical to 0.22); NAMLite-tsize (921) = 0.22 padded with 2 KB of dead .const (-DNAM_PAD_FLOATS=500) to text+const 29,576 B, above 0.23’s 29,336 (largest NAM that booted: 0.22 at 27,536; output bit-identical). Loader reverted to the 0.22 templates meanwhile.

Bisect result (2026-09-29): the engine is innocent. Each file booted and played alone on hardware: t7knob (7 knobs, no gate), tsize (0.22 padded past 0.23’s size), smokey (0.22 engine, slot-2 template) and tgate (FXID 922, .text byte-identical to the 0.23 that froze; Gate knob works). The pedal kept freezing on boot after the 0.23 files were gone while four 0.22-engine NAM files were installed together, and the original freeze had two installed. So the trigger is several NAM files installed at once (each ~30 KB, ~15 KB of it .const weights/tables – far above any other custom). A duplicate-FXID theory (old trials used 901-905) was ruled out from the ZEM list. Pending: two NAM files installed together to confirm, then find the limit. Loader back on 0.23; bisect files in build/nam-archive/2026-09-28/freeze-bisect/.

Cause found (2026-09-29): filename truncation, a documented rule the loader broke. Two NAM files installed together froze on boot (confirmed). The pedal keeps 8 characters of a ZDL basename and freezes on boot when two installed files share the cut-down name (SAFE-DSP-RULES.md, README “Identity and packaging”). Every loader file was NAMLite-<name>.ZDL -> NAMLite-. The trial builds (NAM5, NAM6, NAMFull2, NAMEQ…) had short distinct names and coexisted, which is why the engine, the shared Fx_FLT_NAMLite symbols and the slot-2 template all looked guilty in turn but were not. Fix: the loader names files NAM<slot><first 4 of name>.ZDL (<= 8 chars, unique per slot; tests assert it), PE reads the full embedded NAM-<name> instead of the filename, and build/extract_effect_db.py now refuses to run if any dist/ basename is over 8 characters or collides. dist/: NAM1ampt.ZDL, NAM2smok.ZDL (bytes unchanged).

Hardware 2026-09-29: with the renamed files, both captures installed together boot fine; gate works.

2026-09-30: NAM + CabIR crackles -> engine 0.24 and CabIR trim

Hardware: NAM (0.23) + CabIR 0.20 crackle together; each alone is fine. Pair cost was 15,950 + 950 emulated cycles.

Hardware: 0.24 set froze on load (NAM1ampt/NAM2smok 0.24 + CabIR one-pass). 0.24 is the largest effect ever loaded: text+const 30,336 B (largest that booted: tsize 29,576; 0.23 29,312; HYBRID IR documents a conservative 28,904 B code+const cap for its template). Suspects: a load-size cap between 29,576 and 30,336, the 0.24 code, or the new CabIR. Loader reverted to 0.23; dist/ back to the booted 0.23 captures; 0.24 kept in build/nam-archive/2026-09-28/*-0.24-FREEZE/. Bisect: CabIR (new) with 0.23 captures, then dist/TSize2.ZDL (FXID 921) = 0.23 padded to 30,512 B, output bit-identical to 0.23 – if it freezes, the cap is real.

Size cap confirmed (2026-10-02). NAM 0.23 + new CabIR booted (CabIR fine; the NAM + Cab crackle persists: recording shows ~4 HF dropout bursts/s, clustered 15-45 ms apart = missed callback deadlines). TSize2 (0.23 + dead data, 30,512 code+data) froze when selected -> size cap, not 0.24’s code. 0.24b: warm-up and steady state share ONE predicate-free input loop and ONE output loop (warm-up zeroing is a per-callback mask; mix target 0 until warm keeps warm-up exactly dry). 31,766 B, code+data 29,152 – smaller than 0.23. Host: vs 0.23 87-117 dB below signal after warm-up; warm-up exactly dry. Emulator checks pending (the Ziddle checkout in /tmp was wiped). Emulator (Ziddle re-installed in ~/ziddle): 0.24b 15,277 vs 0.23 15,950 median (-673; 0.24 was 15,311); TI vs host <= 1.2e-7; namstate clean; matcheck PASS. Packaged as loader engine 0.24 (size guard passes); dist/ NAM1ampt and NAM2smok rebuilt (capture 1 byte-identical to the direct build).

2026-10-02: 0.24b “better, still a tiny bit of crackling” -> 0.25 + Eco

Tried and rejected (emulated, flat EQ, 0.24b = 15,277):

Hardware (2026-10-02): NAM-smokeco (0.25 Eco) + CabIR – no crackling. CabIR was 7-9 dB quiet (peak normalisation); now loudness-matched.

2026-10-03: last ticks -> Eco 6/8

Hardware: smokeco (7/8) + CabIR still ticked occasionally with Great Muff (bypassed) in the patch and both EQs active. Owner’s fix confirmed: NAM EQ at 50 (flat-EQ skip) + Great Muff removed -> no overload.

2026-10-06: CabIR one-cab-per-effect (0.30) and 16 NAM slots

CabIR’s bank + Cab knob replaced by 16 single-cab slot effects (FXID 930-945); NAM capture slots extended to 16 (900-907, 950-957). Both template sets re-packaged; slots 1-2 byte-identical to before (installed captures stay valid). PE hides unnamed reserved NAM/CabIR slots unless a patch uses one.

2026-10-06: review suggestions measured (Eco grouping, EQ, gate) – none kept

Emulated callback cycles, smokeco Eco 6/8, owner’s settings (Mid 68 / Treb 66):

Hardware (2026-10-06): NAM-amptrec (full, cost 194) + Great Muff – accepted, no crackle. Pedal DSP limit measured with pass-through cost probes: 224.4 accepted, 228.4 refused. Costs now: full 194 / Eco 7/8 188 / Eco 6/8 177 / CabIR 10; PE meter budget 228. Declared cost, pedal admission and real load agree on every chain tested so far.